Event numbers 13 and 1302 indicate that the Sunny Tripower has discovered a disturbance in the AC cabling and therefore cannot connect to the grid.
Possible causes of this are errors in the AC cabling or an incorrect country setting.


Corrective measures:

If you are the system operator, please contact your installer. .

DANGER! The tasks described below may only be performed by Electrically Qualified Persons:

Inspection of the complete AC cabling, in particular N and PE:

  • Check for for loose terminals
  • Ensure that the AC cables are connected correctly (particularly N and PE)
  • Check the fuses​
  • Measure voltages between N and PE on the inverter and in the sub-distribution:
    TNC-grids: N-PE: must be lower than 0.3 V
    TT grids: N-PE must be lower than 30 V.
    Information: Be sure to use a suitable measuring device such as a multimeter. Voltage detectors (e.g. Duspol) are not suitable for these measurements. 
  • Optionally, measurements can also be conducted between L-N and L-PE, and between L1, L2, L3 in three-phase devices.

 Waiting for grid voltage > Grid failure > Check AC circuit breaker
13, 1301 1302 
Waiting for line voltage
Installation error grid connection
Check grid and fusesSTP 50-40 (CORE1)  
STP 15000TL-30 / 20000TL-30 / 25000TL-30  
STP 15000TLEE-10 / 20000TLEE-10 (-TLHE)   
STP 8000TL-10 / 10000TL-10 / 12000TL-10 / 15000TL-10 / 17000TL-10  
STP 5000TL-20 / 6000TL-20 / 7000TL-20 / 8000TL-20 / 9000TL-20 / 10000TL-20 / 12000TL-20  