Connection at the AC2 terminal
Yes, this is possible.
The utility grid is connected via the AC2 terminal of the Sunny Island.
Please inquire about the connection conditions from the responsible grid operator.
The Sunny Island devices SI3.0/4.4M and SI6.0/8.0H with the “OnGrid” application meet the VDE guideline requirement in Germany. If the “Off-Grid” application is used, the VDE guideline requirement is not met.