Bỏ qua để tới nội dung chính

Kết Nối Sunny Sensorbox Với Sunny Boy Control Plus

To be able to operate a SensorBox on a SBCoP, the following steps must be carried out:

  1. Deactivation of the analog input for the ambient temperature
  2. Deactivation of the analog input for the irradiation
  3. Adjustment of the measurement channel for the irradiation (IntSolIrr) on the SensorBox to variable “+Gi”
  4. Adjustment of the measurement channel for the ambient temperature (TmpAmb C) on the SensorBox to variable “+Team”

Profil2 is designed so that the measurement values for the irradiation and temperature are applied to the analogue inputs Aln 1 and AIn 7. Profil2 is designed so that the measurement values for the irradiation and temperature are applied to the analogue inputs Aln 1 and AIn 7. These measured values are transmitted from the Sunny SensorBox as channel values. Thanks to the above-mentioned configuration, these channel values are re-assigned to the inputs.

For the plant analysis, the existing module surface must be entered in Variable 1 (+A) and the module efficiency entered in Variable 2 (etaM).

Bài viết được Solar SM biên dịch từ tài liệu kỹ thuật của SMA Solar Technology AG. Nếu sự cố chưa được giải quyết, hãy gửi yêu cầu hỗ trợ kỹ thuật hoặc gọi hotline 082 747 7272.